Insulation Testing Device for Live-Line Protective Equipment
Introduction
YTM-IV Insulation Testing Device for Live-Line Protective Equipment is a special equipment for batch testing of insulating boots (gloves) designed and produced by our company according to the requirements of the "Preventive Test Regulations for Electric Power Safety Tools and Equipment" issued by the State Power Corporation, and in compliance with the feedback from the majority of users, with continuous improvement. This product effectively solves the previous non-standard testing, improves work efficiency, ensures work safety, and is the most ideal device for withstand voltage testing of insulating boots (gloves).
Detailed Explanation
Product Aliases: Insulating Boots and Gloves Withstand Voltage Test Device, Protective Tool Insulation Test Bench, Insulating Boots and Gloves Withstand Voltage Tester, Auxiliary Insulation Tool Test Device, Insulating Boots and Gloves Test Device, Insulation Testing Device for Live-Line Protective Equipment, Insulating Shoes and Gloves Testing Machine, Insulating Boots and Gloves Testing Machine
Insulation Testing Device for Live-Line Protective Equipment With professional production technology and professional manufacturing factory, we produce professional high-quality products. Shanghai Feikete Electric Technology Co., Ltd. is one of the few production-oriented enterprises in East China. Choosing Feikete means choosing peace of mind. The Feikete trademark has been registered. Shanghai Feikete is a high-tech enterprise in the Science and Technology Park of Shanghai Electric Power University. For consultation!
I. Overview:
YTM-IV is a special equipment for batch testing of insulating boots (gloves) designed and produced by our company according to the requirements of the "Preventive Test Regulations for Electric Power Safety Tools and Equipment" issued by the State Power Corporation, and in compliance with the feedback from the majority of users, with continuous improvement. This product effectively solves the previous non-standard testing, improves work efficiency, ensures work safety, and is the most ideal device for withstand voltage testing of insulating boots (gloves).
II. Technical Parameters
1. Power supply voltage 220V 50HZ
2. Rated power 3KVA
3. Rated output voltage 30KV
4. Digital display, with zero position, overcurrent, timing, and alarm functions.
II. Usage Method:
1. After unpacking, fix the test device and connect the grounding wire.
2. Before the test, fill the test object with steel balls, then adjust the electrode rod through the locking screw, insert the electrode into the insulating boots (gloves) and adjust the screw to contact the steel ball surface.
3. Remote control key "1" is the stop key, "2" is the start key, "3" is the boost key, "4" is the buck key, "5" is the timing key, and "6" is the spare key.
4. Connect the power supply, press the air switch, the power indicator light is on, press the "2" key, the high voltage indicator light is on. If it does not light up, it means the voltage regulator has not returned to zero. Please press the "4" key to reduce voltage, then press the "2" key, then press the "3" key to boost voltage. When the required voltage is reached, press the "5" key to start timing. When the time is up, the buzzer sounds. Press the "4" key to return the voltage regulator to zero, and press the "1" key to end the test.
5. From the left, the first meter is the high voltage meter (KV), and the six meters behind are smart ammeters (mA). The corresponding indicator lights above the six meters (mA) are overcurrent indicator lights, one-to-one corresponding.
III. Maintenance:
1. After using the device, drain the water in the water tank.
2. If not used for a long time, keep the inside and outside of the water tank dry, and the electrode rod and insulating rod free of moisture.
3. Before use, measure the insulation resistance of the insulating rod. If necessary, use high voltage to test its withstand voltage value, which should not be less than 20KV.
IV. YTM-IV Completeness:
1. Instruction manual 1 copy
2. Certificate of conformity 1 copy
3. Withstand voltage tester 1 unit
4. Power cord 1 piece
5. Remote control 1 piece
6. Insulating boots (gloves) container 6 each
7. Steel balls 1 box
V. Attached is the "Preventive Test Regulations for Electric Power Safety Tools and Equipment" issued by the State Power Corporation, regarding the test items, cycles, and requirements for insulating boots (gloves): (State Power Development [2002] No. 777)


