Product Description


Mining Multi-functional Control Console 



Introduction



Basic features of the electronic transformer capacity characteristic parameter comprehensive tester:



Built-in protection circuit to avoid instrument damage and personnel accidents.



Automatically performs temperature compensation of test data, converting data to values at rated temperature.



Built-in new ultra-light high-energy battery, which has the characteristics of small size and large capacity. The transformer capacity test connection uses imported waterproof plugs, and all wires can be plugged in directly.



Equipped with a high-performance pocket-sized laser-aimed infrared thermometer, with long testing distance and accurate temperature. The measured temperature can be input for temperature correction.



Unique power-saving mode ensures completion of field testing of multiple transformers of various models.



The front cover of the electronic transformer comprehensive tester is attached with standards for no-load loss, load loss, and impedance voltage of 10kV and 35kV distribution transformers, making it convenient for users to compare and verify.



Mining Multi-functional Control Console 



Functions



★ Large screen, high brightness, wide temperature liquid crystal display, all measurement data displayed on one screen, with Chinese menu prompts. The LCD brightness and contrast are adjustable, and it can be clearly displayed even under strong sunlight.



★ Built-in micro printer, Chinese character print output, can directly print test results on site.



★ Built-in protection circuit to avoid instrument damage and personnel accidents.



★ Automatically performs temperature compensation of test data, converting data to values at rated temperature.



★ Built-in new ultra-light high-energy battery, which has the characteristics of small size and large capacity.



★ The transformer capacity test connection uses imported waterproof plugs, and all wires can be plugged in directly.



★ Equipped with a high-performance pocket-sized laser-aimed infrared thermometer, with long testing distance and accurate temperature. The measured temperature can be input for temperature correction.



Mining Multi-functional Control Console 



Operating Instructions





  1. Connect the input power supply AC380V



    Connect the "AC380V power input" to the three-phase four-wire power grid, and connect the ground wire to the earth grid. Never connect the ground wire to the neutral wire or to the shell of other equipment, as this will bring great danger to subsequent testing work. As is well known, when equipment fails or the shell becomes charged, if the operator touches the live part, it is like connecting to a 380V power grid. If grounding is poor or not grounded, it will lose protection for the operator, making the operator as dangerous as connecting to a 380V power grid, which can cause great harm to the operator, and in severe cases, death. Therefore, before use, always check whether the ground wire is in good contact and whether the connected ground grid is truly connected to the earth. For your safety, please strictly follow the requirements.





  2. Check and confirm the wiring. When connecting the AC380V power supply, first cut off the power, and after the wiring is connected, then close the power. At the same time, pay attention that when wiring, hands must not touch the metal parts of the wires, as this can cause electric shock. The correct approach is to first cut off the main power, ensure the wires are not live, then reliably connect the wires to the power supply. After connection, personnel should not touch the wires again, and especially not touch uninsulated metal parts.





  3. According to the different types of switchgear, connect the closing, opening, or various devices requiring power in the switchgear to the switchgear power-on test bench with wires. After connection, close the main power switch, and also close the corresponding AC or DC or current output switch. Adjust the voltage regulator handle, the output voltage will slowly rise, and stop rising when it reaches the required value, then begin various tests on the switchgear to be shipped.





  4. The fixed output on the rear output board means the output voltage is a fixed value. As long as the input voltage does not change, the output voltage will not change.





  5. 5 There are three fuses inside the equipment. If after plugging in the main power, the voltmeter shows no display or overload occurs, it may be that the fuses are blown. Just replace them with the same specifications. However, replacing with larger fuses is very dangerous, as it can cause equipment damage.





  6. 6 After the test is completed, first turn the output adjustment knob counterclockwise to zero, then disconnect the power switch. After discharge is complete, only then can you start disconnecting the wires.




WeChat QR Code
💬
💬 Message

Hello! Have you found what you need? Contact us directly online!

Leave a Message for Consultation
Yangzhou Darui Electric Co., Ltd.
主营产品:Dielectric Loss Tester、Transformer Ratio测试仪、Loop Resistance Tester、高压None线核相仪、Insulation Resistance Tester、Partial Discharge Tester、Cable Fault Tester、DC Resistance Tester等。
☎ Phone: 18952707000(关经理)📞 Landline: 0514-88770377✉ Email: 195214804@qq.com
Verification Code
By submitting, you agree to ourTerms of ServiceandPrivacy Policy
🏠 网站Home📞 一键拨号✉ Contact Us